               The Gilbert Lodge Blog from Brainerd, MN, USA

May 21, 2003

The construction crane is carrying a 5 foot high support that will go over the garage.  This makes it possible to eliminate a pipe support in the garage.       

(Click on the photo or here for a larger view.)     

May 24, 2003

The second floor SIPs are going in place    

(Click on the photo or here for a larger view.)      

Tom, the Master Carpenter, is gluing 2 x 6 headers on top of the second floor SIPs.

Construction methods have changed.  We do not hear continuous hammering sounds, just some saw noises and pops from air driven nail guns.       

(Click on the photo or here for a larger view.)      

This is the living room, which overlooks the lake.  The large opening is where windows will go.       

(Click on the photo or here for a larger view.)     

The upper floor as seen from the southwest corner.    

(Click on the photo or here for a larger view.)      