|
__________________________
G L
Gilbert
Lodge |
||||||||||||||||||||||
Back |
Gilbert Lodge
Blog |
|
|
Monday,
September 12, 2015:
Paula was mowing the lawn at Gilbert Lodge. Hmmm.....I'll bet you didn't know there was a lawn at the Lodge. Here is the story: |
It all started on June
25th when Mark used a stump grinder to get rid of tree stumps that
didn't work into the lawn plan. Then on August 3rd, he used a trencher so underground lawn irrigation pipes could be added. |
A crew from
Landsburg
Landscape Nursery arrived on August 5th.
They had a plan to redo the landscaping at Gilbert Lodge. (l-r) Lead landscaper Shawn, assistant Joe, and project coordinator James Kramvik. There was plenty to do. Landsburg was hired on a time and material basis. The cost was a less than a bid because they did not do all of the work. The Landsburg people brought knowhow and experience. Mark and Paula put a lot of time and muscle into the project. |
Paula put her all into
the job. She even wore out/broke a rake. These things don't
happen for no reason! |
Mark hand dug over 250 feet of trench
for water pipes. The
project seemed like it would never end as the work continued. |
More
trenching. It was a two man operation on turns. Connecting
pipes is too. |
There were plenty of questions to be
answered along the way.
What do we do now??? Then Paula discovered a couple of painted turtles, which she took to the lake. They happily swam away. |
Shawn ran the Bobcat
loader while Joe was still shoveling unwanted roots into a truck. |
Paula was kept busy spreading rich
black dirt and cedar chips.
There was always something more to do. |
The crew showed up with a
Hydro-Seeder in tow on August 21st. Seed, ground newspapers, and
water were mixed, then sprayed on the ground. |
Success. James stopped by to see how the
grass was doing on September 15th. Thumbs up!
|
Quote of the day: A project well done. Mark | < Back to previous story | Ahead to next story > |
............... | More about Gilbert Lodge |
page last edited 10/06/2015